Be advised that dust control applications on municipal gravel roads in the Township of West Lincoln are scheduled to begin on Thursday, May 29, 2025, and are expected to last approximately two to three weeks.
In West Lincoln, a Calcium Chloride product is used on gravel roads for dust control. Calcium Chloride is an effective, long-lasting dust suppressant. Visit the Dust Control page to learn more about Calcium Chloride.